What's New?

  • Draft EIR and Revised Draft General Plan now available! 
    Click here to view. 
  • Submit comments on the DEIR by August 18, 2017. 


What we’re working on now:

  • Receiving comments on all draft documents.


Watch for:

  • Planning Commission Study Session on Draft EIR on Tuesday, August 15, 2017 at 7pm, at Belmont City Hall. 

PREFERRED PLAN DOCUMENTS

GENERAL PLAN DOCUMENTS

WORKING PAPERS DOCUMENTS

COMMUNITY OUTREACH SUMMARIES AND MATERIALS

NEWSLETTERS

Documents

Documents will be available on this page as they are prepared.​ General Plan documents are listed below the EIR documents on this page.

ENVIRONMENTAL IMPACT REPORT DOCUMENTS

Comments on the Draft EIR are accepted through 5pm Friday, August 18th, 2017. Submit comments in writing to Carlos de Melo, City of Belmont Community Development Director. Click here for contact information. This Draft EIR covers the General Plan, Phase I Zoning, Belmont Village Specific Plan, and Climate Action Plan


Download Document PDF                                   Date PublishedFile Size
Cover and Table of Contents
6/30/17
2.7 MB
1. Executive Summary
6/30/17
7.5 MB
2. Introduction and 3. Project Description6/30/17

10.8 MB

4. Environmental Impact Analysis6/30/17
138 KB
    4.1 Aesthetics6/30/17
5 MB
    4.2 Air Quality6/30/17
1.7 MB
    4.3 Biological Resources6/30/17
12.9 MB
    4.4 Cultural Resources6/30/17
1.5 MB
    4.5 Geology, Soils and Seismicity6/30/17
23.4 MB
    4.6 Energy, Greenhouse Gases, and Climate Change6/30/17
983 KB
    4.7 Hazards and Hazardous Materials6/30/17
3.2 MB
    4.8 Hydrology, Flooding and Water Quality6/30/17
1.6 MB
    4.9 Land Use, Housing and Population6/30/17
4.7 MB
    4.10  Noise6/30/1715.8 MB
    4.11 Public Services and Recreation6/30/17
6.3 MB
    4.12 Transportation6/30/17
26.6 MB
    4.13 Utilities6/30/17
7.2 MB
5. Analysis of Alternatives6/30/17
6.2 MB
6. CEQA Required Conclusions6/30/17
462 KB
7. References6/30/17
230 KB
8. List of Preparers6/30/17
63 KB
Appendices6/30/1719.3 MB



Notice of Preparation8/30/16

5 MB




JUNE 2017 REVISED PUBLIC REVIEW DRAFT GENERAL PLAN 

Download Document PDFDate PublishedFile Size
Cover and Table of Contents6/30/17
3.1 MB
1 Introduction6/30/17
7.7 MB
2 Land Use Element6/30/17
14.6 MB
3 Circulation Element6/30/17
10.1 MB
4 Parks, Recreation and Open Space Element6/30/17
10.7 MB
5 Conservation Element6/30/17
20.7 MB
6 Safety Element6/30/17
8.6 MB
7 Noise Element6/30/17
6.5 MB








PHASE I ZONING

Download Document PDFDate PublishedFile Size
Revised Public Review Draft Phase I Zoning6/30/17
3.8 MB




APRIL 2016 PUBLIC REVIEW DRAFT GENERAL PLAN


Download Document PDF

Date Published    


File Size

Redline Public Review Draft General Plan PDF4/1/20165.7 MB
1 Introduction
4/1/2016
3.6 MB
2 Land Use Element
4/1/2016
6.3 MB
3 Circulation Element
4/1/2016
2.9 MB
4 Parks, Recreation, & Open Space Element
4/1/2016
2.9 MB
5 Conservation Element
4/1/2016
6.6 MB
6 Safety Element
4/1/2016
4.1 MB
7 Noise Element
4/1/2016
7.3 MB
Public Review Draft General Plan Figures
4/1/2016
28.1 MB
Conservation Element Excerpt - General Plan Design Sample
4/1/2016
2.5 MB












​PRELIMINARY GENERAL PLAN DOCUMENTS

Download Document PDFDate PublishedFile Size
Preliminary Draft Circulation Element PDF1/28/2016364 KB
Preliminary Draft Land Use Element12/23/2015497 KB
Preliminary Draft Parks, Recreation, and Open Space Element12/1/201516.1 MB
Preliminary Draft Conservation Element 
11/17/2015774 KB
GP Safety, Noise, and Land Use 2 Presentation2/16/20168.3 MB
GP Circulation Presentation PDF2/2/20164.9 MB
GP Land Use Presentation1/5/20163.6 MB
GP Conservation Presentation12/1/2015471 KB
GP Pros Presentation11/17/20151.6 MB













COMMUNITY OUTREACH SUMMARIES AND MATERIALS 

Download Document PDF              Date PublishedFile Size
SURVEY RESULTS

Community Survey Results6/9/152.3 MB
CITY COUNCIL/PLANNING COMMISSION STUDY SESSION #1

Presentation3/30/15​22.4 MB
COMMUNITY WORKSHOP #2B

Workshop Report3/4/2015
15.6 MB
COMMUNITY WORKSHOP #2

Workshop Report2/9/201514 MB
Workshop Powerpoint1/23/201519.6 MB
Workshop Agenda1/23/201546 KB
COMMUNITY WORKSHOP #1

Workshop Report11/26/20143.6 MB
Workshop Powerpoint11/13/20144.1 MB
Workshop Agenda11/13/201499 KB
STAKEHOLDER INTERVIEWS

Report11/14/2014419 KB




PREFERRED PLAN DOCUMENTS

Download Document PDF                                       
Date Published 
File Size

PROPOSED PREFERRED PLAN (Revised for CC/PC Meeting)       

Older Draft Components:

What is the Belmont General Plan Update?

7/30/2015


5/22/2015

7.3 MB


2.2 MB

Draft Preferred Plan Land Use Diagram5/22/20151 MB
Draft Land Use Designations5/22/2015947 KB
Preferred Plan Circulation Overview5/22/20151.9 MB
Preferred Plan Circulation Components5/22/20152.6 MB
Preferred Plan Parks, Open Space, and Recreation5/22/20151.6 MB
Results of the Communitywide Survey - Part 15/22/2015897 KB
Results of the Communitywide Survey - Part 2
5/22/2015420 KB













WORKING PAPERS DOCUMENTS

Download Document PDFDate PublishedFile Size
Working Paper #1: Land Use
3/10/201522 MB
Working Paper #2: Circulation
3/10/20154.9 MB
Working Paper #3: Public Resources 
3/10/201530 MB







NEWSLETTERS

Download Document PDF                                       

Date Published

​File Size
Newsletter 3: Spring 2016
4/1/20161.1 MB
Newsletter 2 and Mail-in Survey: March 2015
3/30/20151.2 MB
Newsletter 1: Autumn 201410/22/2015964 KB